Solar installation.
Roof-mounted and in-roof solar panel systems. Full survey, design, installation, and MCS certification.
Service Coming SoonAbout this service
What you can expect.
We handle the complete solar journey: structural survey, panel layout design, scaffolding, installation, DNO grid connection application, and MCS certification. Battery storage systems (Tesla Powerwall, GivEnergy, Fox ESS) can be added at install or retrofitted later. Every system is designed for the specific property, not a generic template.
Why choose us
The House standard.
- MCS-certified installation, qualifies for Smart Export Guarantee payments
- Full structural and electrical survey before any work begins
- Battery storage integration available at install or later
- DNO application and grid connection handled for you
What's included
Every visit.
- Site survey and system design
- Scaffolding and installation
- Inverter, mounting, and all electrical work
- DNO notification and MCS certification
- System monitoring setup and handover
Questions
About solar installation.
Most residential installations take 2-3 days. Larger systems or battery additions may take an extra day.
Most domestic solar installations are permitted development. We check and advise before quoting.
Enquire
Ask about solar installation.
Tell us about your home and what you need. We come back to you personally, usually within one working day. Or book online in a couple of minutes.
Prefer to book online? Book through HoWA.
Ready when you are
Solar installation is coming soon.
A short consultation, a fair quote, and a team that arrives when we said they would.